// Santa Barbara, CA

Santa Barbara Waterfront

  • CLIENT \\
    City of Santa Barbara
  • LOCATION \\
    Santa Barbara, CA
  • SIZE \\
    3 miles

Bionic is leading the adaptation and planning for 3-miles of the Santa Barbara Waterfront for the 30-Year Waterfront Adaptation Plan with Stantec. Orchestrating short and long term solutions, the multi-year planning effort will create a practical plan that will prepare the Santa Barbara Waterfront for increased storm surges, erosion, and flooding by providing solutions that preserve and enhance recreation, commerce, beach access, habitat, and critical infrastructure for the near term and future generations. The Waterfront is already at risk of flooding, storm surge, and erosion during coastal storms and these impacts will get significantly worse with even small amounts of sea-level rise. Bionic is leading adaptation strategies for the public realm, as well as detailed design for a new segment of the multi-modal Beachway including adaptation measures along the waterfront. Bionic is also leading the outreach strategy and the public facing exhibits, including a three-dimensional flood model, to engage with the community throughout the process.

Leadbetter Quick Wins: Immediate safety & flooding fixes

Leadbetter Core Measures: Keep sandy beach by moving things back

Leadbetter Future Options: Larger projects for a wider beach & more protection

Harbor Quick Wins: Immediate safety & flooding fixes

Harbor Core Measures: Flood protection, prioritize public access & boating

Harbor Future Options: Further protection

West Beach Core Measures: Premier sandy beach experience

East Beach Potential Core Measures: Preserve as much sandy beach as long as possible & protect critical infrastructure

East Beach Potential Future Options: Additional, larger projects for wider beach & increased protection